為便于供應(yīng)商及時了解采辦項信息,現(xiàn)將(惠州26-6油田開發(fā)項目封隔器、注水系統(tǒng))的采辦計劃公開如下:
序號 | 采辦項 名稱 | 采購范圍與主要技術(shù)指標 | 預(yù)計發(fā)標時間 (填寫到月) | 供應(yīng)商資質(zhì)基本要求 | 備注 |
1 | 惠州26-6油田開發(fā)項目封隔器系統(tǒng) | ★Grout Packers, Pile Grippers and Grouting System shall be designed to adapt the changes of air temperature, the range of air temperature variation is listed as follows: max. temp. should not be lower than 50°C, min. temp. should not exceed -22°C. ★The applicable pile diameter for Grout Packers and Gripper is2591 mm. ★It shall be inflatable Grout Packer (rubber element can be inflated using air, nitrogen or sea water). ★The Grout Packers can support a column of grout high at least 22.5meters under one-stage continuous grouting. ★The hold capacity for single Pile Gripper is1800Tonnes. ★Check Valve shall be designed according to the requirement of API 6D or equivalent. ★The pressure class for Check Valve should not be lower than ANSI Class 300. ★It shall be welded between valve and grouting pipe. ★The Factory Acceptance Testing shall be conducted under Third Party certification and COMPANY witness, The Third party Certify Agency shall be chosen from any one of the following certify agencies authorized by COOOSO, which are DNV, BV, ABS and CCS. And vendor shall submit inspection and testing report signed by the Third Party. The testing should include the following items: (1) The packer elements shall be tested using air or nitrogen. (2) The grippers shall be pressure tested and function tested using primary and hot-stab ports. Water shall not be used for testing and commissioning. (3) Each tube in every bundle shall be pressure tested to 1.2 times the operating pressure. ★出廠驗收測試應(yīng)在第三方和業(yè)主的見證下進行,第三方應(yīng)為COOOSO認可的DNV,BV, ABS和CCS中的一家。且供貨商應(yīng)提交由第三方簽發(fā)的檢驗和測試報告。測試內(nèi)容應(yīng)包含以下項目: (1) 封隔器單元需要使用空氣或氮氣進行壓力測試。 (2) 卡樁器需要使用主要和次要接口進行壓力和功能性測試。測試和調(diào)試介質(zhì)不能使用水。 (3) 控制管束中的每根管線需要按照1.2倍操作壓力進行壓力測試。 ★The supplied equipment package shall withstand acceleration loads of up to 50gwithout damage, where g is the gravity acceleration. ??? The design water depth for Grout Packers, Pile Grippers and Grouting System shall be up to 115 meters. ? The supplied equipment package shall withstand loads induced during fabrication and installation of the structure. The supply scope for the package of jacket grout packers, grippers and grouting system is listed as follows, but not limited to: ? Grout Packers: 12Sets; ? All necessary assemblies kits for Grout Packer (include but not limited to: grout packer, inflation system, flat wiper, ROV/diver secondary packer inflation system); ? Steel packer can and test mandrel are not in the supply scope of grout packers(steel packer can shall be designed by supplier, and Fabrication contractor shall manufacture it according to supplier’s requirements); ? 可膨脹式封隔器:12套; ? 可膨脹式封隔器必要的組件(包括但不限于封隔器,充氣/水系統(tǒng),擋泥板,ROV/潛水員操作的備用充氣/水系統(tǒng)); ? 封隔器鋼筒體以及測試模擬樁不在封隔器的供貨范圍內(nèi)(封隔器鋼筒體由廠家進行設(shè)計,建造方應(yīng)按照廠家要求進行制造); ? Pile Gripper:4 Sets; ? All necessary assemblies kits for Pile Gripper (include but not limited to: hydraulic pile gripper, gripper control panel, gripper retract/extend line, interface connector, gripper hot stab, hydraulic oil,etc.) ? 卡樁器:4 套; ? 卡樁器必要的組件(包括但不限于液壓卡樁器,控制面板,卡緊/松開控制管線,接頭,手柄,液壓油等). ? Grouting Assemblies shall include but not limited to as follows: ? 36 sets2" check valves for grouting; ? 12 sets male ROV grouting hot stabs; ? 2 setsfemale grouting receptacles; ? Other necessary assemblies kits. 灌漿組件應(yīng)包括但不限于下列各項: ? 36個2寸灌漿單向閥; ? 12個灌漿ROV公接頭; ? 2個灌漿母接頭; ? 其他必要組件。 ? All control SS tubes and bundles which are used in grout packers and pile grippers. The tubing should be long enough to connect to the control panel. ? Quick connector panel design and sufficient number of quick connectors to meet the functional requirements of grout packers and grippers. ? Sufficient number of clamps to fix tubing from pile sleeve to the control panel. ? Rental power station for onshore testing and offshore operation. ? Services including: ? Warranty Period: until the jacket have finished installation offshore. ? The vendor shall be responsible for the complete design, equipment purchasing, manufacture, inspection and testing, certifying, shipment, installation guidance, commissioning on site and post-sale service for all supplied packages. ? VENDOR shall guarantee to provide all the design drawings, documents and technical services of the complete package. ? Vendor shall guarantee engineering, workmanship and materials of the supplied equipment package to meet the design conditions. | 2022年12月 | 1.制造商在近5年內(nèi)(以截標日期為準)簽訂合同并已成功實施的至少1個海上導(dǎo)管架項目。為制造商在近5年內(nèi)(以截標日期為準)簽訂合同并已成功實施的至少1個海上導(dǎo)管架項目。這個已成功實施的海上導(dǎo)管架項目所提供的設(shè)備應(yīng)滿足以下要求: (1)封隔器、卡樁器、灌漿系統(tǒng)和隔膜的實際使用水深應(yīng)不低于138米;(2) 水泥漿封隔器是可膨脹式水泥漿封隔器(填充橡膠單元的介質(zhì)可以為空氣,氮氣或者海水);(3) 封隔器、卡樁器和隔膜適用于樁徑應(yīng)不低于2438mm; (4)單個卡樁器的設(shè)計卡樁能力應(yīng)不低于2000噸。 2.業(yè)績證明文件包含但不限于:提供正式的合同文件、供貨清單、成功運行的業(yè)主證明文件等。 | |
2 | 惠州26-6油田開發(fā)項目注水系統(tǒng) | ★ The applicable water depth for flooding and venting system shall be up to 115 meters. ★ Hydraulic driven flooding and venting system shall be designed to adapt the changes of air temperature, the range of air temperature variation is listed as follows: max. temp. : should not be lower than 50°C, min. temp. should not exceed -22°C. ★It shall be trunnion mounted 1/4 turn full port ball valve. ★The size for valves in hydraulic driven flooding and venting system is listed as follows: Hydraulic Flooding Valve: 4 in; ROV Operated Flooding Valve: 4 in; Hydraulic Venting Valve: 2 in and 4 in; Manual Operated Venting Valve: 2 in and 4 in; ★ 液壓充水和放空系統(tǒng)的閥門尺寸如下所示: 液壓充水閥門:4英寸; ROV 操作充水閥門:4英寸; 液壓放空閥門:2英寸和4英寸; 手動操作放空閥門:2英寸和4英寸。 ★Valves shall be designed according to the requirement of API 6D or equivalent. ★The pressure class for valves in flooding and venting system is listed as follows: Valves: ANSI Class 150 Raised Flanges: ANSI Class 150 ★ 液壓充水和放空系統(tǒng)閥門的等級如下所示: 閥門:ANSI Class 150 凸面法蘭:ANSI Class 150 ★ Hydraulic flooding and hydraulic venting valves shall be equipped with hydraulic actuators. ★Actuators for hydraulic valves shall be hydraulic operation single acting with spring close. ★The Factory Acceptance Testing shall be conducted under Third Party certification and COMPANY witness, The Third party Certify Agency shall be chosen from any one of the following certify agencies authorized by COOOSO, which are DNV, BV, ABS and CCS. And vendor shall submit inspection and testing report signed by the Third Party. The testing should include the following items: (1) The ball valves shall be subsea simulation tested with the simulated water depth 172.5m (1.5 times the applied water depth); (2) The ball valves shall be torque tested; (3) Each tube in every bundle shall be pressure tested to 1.2 times the maximum allowable operating pressure; ★出廠驗收測試應(yīng)在第三方和業(yè)主的見證下進行,第三方應(yīng)為COOOSO認可的DNV,BV, ABS和CCS中的一家。且供貨商應(yīng)提交由第三方簽發(fā)的檢驗和測試報告。測試內(nèi)容應(yīng)包含以下項目: (1) 球閥需要進行水下模擬試驗,試驗的模擬水深為172.5 m(1.5倍的適用水深); (2) 球閥需要進行扭矩試驗; (3) 控制管束中的每根管線需要按照1.2倍操作壓力進行壓力測試。 ? All valves shall be with raised face flanges at each end. .? ROV operated flooding valve and manual operated venting valve should be equipped with levers, the total length of lever for ROV operated flooding valves shall not be less than 500mm. ? Open/Close Torque for ROV Operated Flooding Valves shall not be greater than 250 N-m. The ROV operated flooding valve can be designed to operate with ROV wrist torque, but the valve operating torque shall not exceed 170 N-m. ? The velocity for hydraulic driven flooding and venting system design during jacket launching is 6.46 m/s. The supply scope for the jacket hydraulic driven flooding and venting system is listed as follows, but not limited to: ? 4" Hydraulic operated flooding valves: 12Sets; ? 4" ROV operated flooding valves: 12Sets; ? 4" Hydraulic operated vent valves: 1Sets; ? 4" Manual operated vent valves: 1Sets; ? 2" Hydraulic operated vent valves: 12Sets; ? 2" Manual operated vent valves: 12Sets; ? All necessary assemblies kits for valves (include but not limited to actuator, filter/strainer, bolts, washer, spring washer, 316SS Gasket, nuts, levers). ? All hydraulic control 316SS tubing which are used in hydraulic driven flooding system; ? Quick connector; ? Pressure gauges installed in venting system (exclude testing gauges); ? Clamp and Band c/w bolts and nuts to fix tubes; 導(dǎo)管架液壓充水和放空系統(tǒng)的供貨范圍包括但不限于下列內(nèi)容: ? 4寸液壓操作充水閥:12套; ? 4寸ROV操作充水閥:12套; ? 4寸液壓操作放空閥:1套; ? 4寸手動操作放空閥:1套; ? 2寸液壓操作放空閥:12套; ? 2寸手動操作放空閥:12套; ? 閥門必要的組件(包括但不限于驅(qū)動器,過濾器,螺栓,墊圈,彈簧墊圈,316不銹鋼墊片,螺母,手柄); ? 所有用在該液壓充水系統(tǒng)上的液壓控制316不銹鋼管束; ? 快速接頭; ? 安裝在放空系統(tǒng)上的壓力表(不包括測試用的壓力表); ? 用來固定液壓管的卡子和綁帶(包括螺栓螺母)。 ? Flooding & venting valves’ selection design. ? The design for venting manifold, the quick connect panel, protector for flooding valves and operation platform. ? Supports of SS tubes/bundle design. ? Services including: onshore commissioning and testing, offshore operations. ? HPU leasing: Provides the HPU including Umbilical flooding control hoses c/w wheel, flooding and venting control panel, hydraulic oil for onshore commissioning and testing, offshore operation, and testing gauges etc.. ? Warranty Period: until the jacket have finished installation offshore. ? The vendor shall be responsible for the complete design, equipment purchasing, manufacture, inspection and testing, certifying, shipment, installation guidance, commissioning on site and post-sale service for all supplied packages. ? Vendor shall guarantee engineering, workmanship and materials of the supplied equipment package to meet the design conditions. | 2022年12月 | 1、制造商在近5年內(nèi)(以截標日期為準)簽訂合同并已成功實施的至少1個海上導(dǎo)管架項目。為這個已成功實施的海上導(dǎo)管架項目所提供的設(shè)備應(yīng)滿足以下要求:(1)閥門的類型應(yīng)是全口徑固定式1/4回轉(zhuǎn)球閥; (2)液壓驅(qū)動閥門(包括注水閥門和排氣閥門)2英寸和4英寸, ROV 操作注水閥門4英寸, 手動操作排氣閥門2英寸和4英寸; (3) 液壓注水和排氣系統(tǒng)閥門的壓力等級應(yīng)不低于ANSI Class 150; (4) 液壓閥的驅(qū)動器型式應(yīng)為液壓驅(qū)動開,彈簧關(guān);(5) 液壓驅(qū)動注水和排氣系統(tǒng)的實際使用水深應(yīng)不低于138米。 2.業(yè)績證明文件包含但不限于:提供正式的合同文件、供貨清單、成功運行的業(yè)主證明文件等。 | |
本次公開的采辦計劃是本項目第一批采辦工作的初步安排,實際采購應(yīng)以相關(guān)采購公告和采購文件為準,所有提供和反饋的信息只作為項目采辦參考。
本次公告有效期是(**日)至(**日)止。在此期間,有意參與某采辦包的 (略) 采辦系統(tǒng)中提交反饋材料。
單位名稱:惠州26-6油田開發(fā)項目
**日
剩余會員時長將自動延長
掃描添加客服微信
暫無歷史郵箱
使用微信掃一掃關(guān)注
“銷邦招標”